A finished marble bathroom with a freestanding tub

Client reviews

4.9 from 168 reviews, including the ones that cost us a star

Every review below is shown as written. Two of them are four stars, and we have left them where they are.

Average
4.9 out of 5
Reviews
168 total
Sources
Google, Houzz, Angi

The summary

Where the numbers come from

4.9

168 reviews across three platforms

  • 5 star147
  • 4 star18
  • 3 star3
  • 2 star0
  • 1 star0
  • Google4.992 reviews
  • Houzz5.041 reviews
  • Angi4.835 reviews
  • A note on sample content

    This is a demonstration website. The reviews, names and figures below are illustrative and are not real customer testimonials.

In their words

Twelve reviews, newest first

Each one names the neighbourhood and the scope, because a five star powder room and a five star fifteen week ensuite are not the same achievement.

  • Priya R.Gold Coast · March 2026

    Fifteen weeks, and the finish date they gave us in week one is the date we moved back in. The onyx wall is the best thing in the house.

    Primary ensuite
  • Marcus O.Lakeview · February 2026

    They found a failed pan and a wet joist on day three, priced the fix in writing the same afternoon, and it did not move the schedule.

    Walk-in showers
  • Elena V.River North · January 2026

    Twenty-six square feet and they still did a full lighting study. Guests ask about the stone before they ask about the view.

    Powder rooms
  • Tom H.Lincoln Park · December 2025

    Five weeks, one crew, and the same two faces every morning. My wife knew the carpenter's coffee order by the second week.

    Tub to shower
  • Rosalind K.Hyde Park · November 2025

    Our co-op board approved it in one meeting. They submitted the waterproofing detail before anyone thought to ask for it.

    Full bathroom remodel
  • Ayo B.Evanston · October 2025

    We asked for accessible without it looking accessible. Brass bars, a walnut seat, and a turning circle nobody notices.

    Accessible bathrooms
  • Jonah F.Gold Coast · September 2025

    Excellent build, and they were straight with us about cost. The stone lead time ran three weeks long, which nobody enjoyed.

    Full bathroom remodel
  • Claudia M.Lincoln Park · August 2025

    They interviewed me about what I keep in a bathroom. Nobody has ever done that. Every drawer now holds exactly what it should.

    Vanities and storage
  • Devin S.Lakeview · July 2025

    The dry-lay changed my mind about the layout before anything was cut. That hour saved a mistake I would have looked at daily.

    Tile, stone and floors
  • Nadia T.River North · June 2025

    Post-tension slab, so no curbless. They told us that at the first visit instead of discovering it after we had paid for drawings.

    Primary ensuite
  • Greg and Susan W.Evanston · May 2025

    The thirty-day visit was real. Someone came back, adjusted every drawer and the glass door, and did not send an invoice.

    Walk-in showers
  • Imani C.Hyde Park · April 2025

    Beautiful small room. Scheduling around our building's elevator hours added a week we had not planned for.

    Powder rooms

Our co-op board approved it in one meeting. They submitted the waterproofing detail before anyone thought to ask for it.

Rosalind K.Hyde Park co-op, period rebuild

Let us look at the room

Forty-five minutes, two people, one inspection panel and an honest range. There is no charge and no follow-up sales call.

Request an estimate(312) 555-0214

Serving Chicago and the North Shore. Showroom visits by appointment.

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.