A low-lit private suite: freestanding tub, wet-room glass, warm stone and lighting you can dial from bright to almost dark.

Typical investment
$68,000 - $180,000
Time on site
10 to 16 weeks on site
Warranty
10 yr waterproofing

The overview

The ensuite is the room our clients spend the most time designing and the least time explaining to guests. It is private, so it can be darker, quieter and more material than the rest of the home.

We treat a primary ensuite as one room with four jobs: wash, soak, dress and store. Most Chicago ensuites fail at the last two. A 1990s builder layout hands you a garden tub nobody uses, a small shower, and a vanity wall with no landing space. We remodel the layout before we remodel the finishes.

The suite we build most often puts the shower and the freestanding tub behind one run of glass, so the wet side reads as a single room. That frees the dry side for a long double vanity, a tall linen tower and, when the plan allows it, a separate water closet with its own exhaust.

Finish is where the atelier work happens. Slabs are selected from the yard with you, laid out on our shop floor and dry-fit before a single tile is set. Brushed and polished metals are chosen under the exact temperature of light the room will use, not under showroom fluorescents.

What is included

Everything in the scope, written down

Allowances are named in the contract so you know exactly what is covered and what is not.

  • Layout study

    Two or three plan options drawn to scale against your plumbing stack and joist direction.

  • Slab selection

    A yard visit with your designer, plus a dry-lay of the book-matched slabs in our shop.

  • Wet-room glass

    Custom low-iron frameless panels, measured after tile and templated on site.

  • Lighting scenes

    Four preset scenes wired to a keypad: morning, day, evening and night.

  • Heated floors

    Electric mat under stone with a programmable thermostat and a dedicated circuit.

  • Millwork

    Shop-built vanity, linen tower and mirror cabinetry in a finish matched to the stone.

How it runs

From first visit to handover

  1. Measure and survey

    We open a small inspection panel, confirm the stack, and photograph everything behind the wall.

  2. Design and selections

    Plan, elevations, a full material board and a fixed price before anything is ordered.

  3. Order and stage

    Everything lands in our warehouse first. We do not start demolition on a partial order.

  4. Build

    One lead carpenter on site daily, one project manager, and a written schedule you can hold us to.

  5. Commission

    We run every fixture, balance the lighting scenes and hand over a care guide for your stone.

Primary ensuite suites detail

Why clients choose it

  • One crew from demolition to final clean, no rotating subcontractors
  • Fixed price after design, with a written allowance schedule
  • Daily site photos and a shared schedule you can check from your phone
  • Waterproofing inspected and photographed before tile goes on
  • Ten-year workmanship warranty on the waterproofing assembly

What moves the number

Four things that change the price

None of these are surprises if they are checked at the first visit, which is why we open an inspection panel before we quote.

FactorWhat it means for your budget
Moving the stackRelocating the toilet or shower drain in a concrete-deck condo is the single largest cost driver.
Stone selectionA book-matched onyx or quartzite feature wall can be a third of the material budget on its own.
GlassLow-iron, oversized or steam-rated glass panels carry a premium over standard clear glass.
Building rulesHigh-rise buildings set work hours, elevator windows and insurance minimums that affect the schedule.

Questions

About primary ensuite

Four things clients ask us about this scope every month.

Most clients do. We seal the corridor with a zipper wall, run a negative-air machine and keep a second bathroom working. If the ensuite is the only full bath, we talk about that during design, not during demolition.

A bathroom needs one bright scene for grooming and shaving. Everything else can be low. We wire a dedicated task layer at the mirror at 3000K and let the rest of the room sit warmer and dimmer.

Yes. Roughly a third of our projects come in with drawings already. We price from them, flag anything that will not work against the existing plumbing, and build.

We carry the risk. Slabs are our responsibility from the yard to the wall, and we keep a reserve piece from the same block wherever the yard will sell it.

Let us look at the room

Forty-five minutes, two people, one inspection panel and an honest range. There is no charge and no follow-up sales call.

Request an estimate(312) 555-0214

Serving Chicago and the North Shore. Showroom visits by appointment.

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.