Chicago street architecture

Gold Coast · 60610, 60611

Bathrooms in Gold Coast

Landmark district rules, co-op boards and small elevators. Gold Coast bathrooms are the most paperwork and the most rewarding stone work.

From the studio
8 minutes from the studio
Postcodes
60610, 60611
Housing stock
Pre-war greystones, co-ops and full-service high-rises

Local notes

What building a bathroom in Gold Coast actually involves

Most of our Gold Coast work sits in buildings built between 1890 and 1930, with a handful of 1970s towers along the lake. The bathrooms are small by modern standards and almost always laid out around a plumbing stack that cannot move.

Two things drive the schedule here: building approvals and elevator access. Several buildings on Astor, Banks and Schiller allow deliveries only in a two-hour weekday window, so we stage everything in our warehouse and deliver in one coordinated run.

The reward is that these rooms take stone beautifully. High ceilings mean a feature wall can run full height, and the original proportions suit book-matched slabs far better than a 1990s subdivision bathroom does.

Proof

Work and words from Gold Coast

Fifteen weeks, and the finish date they gave us in week one is the date we moved back in. The onyx wall is the best thing in the house.

Priya R.Gold Coast · Primary ensuite

Excellent build, and they were straight with us about cost. The stone lead time ran three weeks long, which nobody enjoyed.

Jonah F.Gold Coast · Full remodel

Book a visit in Gold Coast

Forty-five minutes, two people, one inspection panel and an honest range. There is no charge and no follow-up sales call.

Request an estimate(312) 555-0214

Serving Chicago and the North Shore. Showroom visits by appointment.

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.