Walk-in showers and wet rooms

Bathroom service

Walk-in showers and wet rooms

Curbless entries, frameless low-iron glass, linear drains and a bench that is actually comfortable to sit on.

Typical investment
$28,000 - $72,000
Time on site
5 to 9 weeks on site
Warranty
10 yr waterproofing

The overview

A walk-in shower is mostly a waterproofing project wearing a glass costume. Get the slope, the membrane and the drain right and the rest is finish work.

Curbless entries are the most requested detail we build and the easiest one to get wrong. The floor has to fall to the drain across the whole wet zone, the membrane has to turn up the wall behind the tile, and the joists usually have to be furred or sistered to make room for the slope without a step.

We favour linear drains at the back wall or along the entry. A single-direction slope is easier to build flat, easier to tile with large-format stone, and it keeps the floor pattern running in one direction rather than pinwheeling into a centre drain.

Glass is templated after tile, never before. We use low-iron glass where the stone has colour worth seeing through it, and we detail the panel so water runs back into the wet zone instead of down the outside face onto your floor.

For wet rooms, we place the tub and the shower behind one glass plane. That needs a proper exhaust strategy, because the room will hold steam longer than a standard shower enclosure does.

What is included

Everything in the scope, written down

Allowances are named in the contract so you know exactly what is covered and what is not.

  • Sloped substrate

    Pre-sloped pan or a mud bed built to a true single-direction fall.

  • Bonded membrane

    Sheet or liquid membrane, corners banded, flood-tested for 24 hours.

  • Linear drain

    Tile-in or slot drain set flush, with a removable hair basket you can actually reach.

  • Frameless glass

    Templated after tile, low-iron where it matters, with a dry-side drip detail.

  • Bench and niche

    Waterproofed bench at a comfortable height and a niche sized to your bottles.

  • Valve strategy

    Thermostatic or pressure-balance valves with the handheld reachable from the bench.

How it runs

From first visit to handover

  1. Floor assessment

    We check joist depth and direction to see whether curbless is possible without raising the room.

  2. Drain and slope plan

    Drain position, fall direction and tile size are decided together, not separately.

  3. Waterproof and test

    Membrane goes on, the pan gets flooded, and we photograph the result.

  4. Tile and template

    Stone is dry-laid and set, then the glass shop templates the finished opening.

  5. Glass and trim

    Panels hung, hardware set, valves trimmed and the room commissioned.

Walk-in showers and wet rooms detail

Why clients choose it

  • No curb to step over, now or in twenty years
  • Large-format stone stays flat because the floor falls one way
  • Flood-tested waterproofing with photo documentation
  • Glass that keeps water in the wet zone instead of on your floor
  • Benches sized for shaving, not for decoration

What moves the number

Four things that change the price

None of these are surprises if they are checked at the first visit, which is why we open an inspection panel before we quote.

FactorWhat it means for your budget
Joist directionRunning parallel to the drain line makes a curbless build simpler and cheaper.
Concrete decksHigh-rise slabs cannot be cut freely, so the recessed pan may need a raised floor instead.
Glass sizeOversized panels need heavier hardware and sometimes a structural header.
SteamA steam-rated enclosure needs a full ceiling, a sloped soffit and a different door seal.

Questions

About walk-in showers

Four things clients ask us about this scope every month.

Not if the wet zone is sloped correctly and the glass is detailed to shed inward. We also keep a subtle fall on the dry side of the threshold as a second line of defence.

Sometimes. In a condo with a post-tension deck we cannot cut the slab, so we either raise the whole bathroom floor or accept a very low tapered threshold. We tell you which one applies before design starts.

It is easier. The basket lifts out in one piece and the channel wipes clean. Centre drains collect more in the surrounding grout joints.

We hold water on the pan for a full 24 hours and photograph it before and after. It is the cheapest insurance in the whole project.

Let us look at the room

Forty-five minutes, two people, one inspection panel and an honest range. There is no charge and no follow-up sales call.

Request an estimate(312) 555-0214

Serving Chicago and the North Shore. Showroom visits by appointment.

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.