
Original tile failing at the base, a leaking waste branch and no waterproofing behind any wet surface.

Hyde Park ยท 2024
A 1923 bathroom rebuilt with modern waterproofing and a hidden heated floor, detailed so it still reads as original to the building.
The brief
The co-op board required that the bathroom remain sympathetic to the building. The owners required that it stop leaking into the unit below.
We rebuilt everything behind the finish line: new supply, new waste, full membrane, blocking, and a heated floor. The visible room went back with period-correct proportions.
Hex mosaic floor, a subway field with a bullnose cap rail, a refinished original cast iron tub and nickel fittings with cross handles.
1923 co-op, third floor
Before and after

Original tile failing at the base, a leaking waste branch and no waterproofing behind any wet surface.

The same room the building always had, with a heated floor and a membrane the engineer signed off on.
The scope
The board approved it in one meeting. That has never happened to anyone in this building.
More work

Forty-five minutes, two people, one inspection panel and an honest range. There is no charge and no follow-up sales call.
Serving Chicago and the North Shore. Showroom visits by appointment.
We value your privacy
We use cookies to run this site, remember your preferences and understand how it is used.Cookie policy